Basement finishing in Montreal & the West Island

A finished basement is the most cost-effective square footage you can add to a Montreal home. It is also the most failure-prone if the moisture, ventilation, and insulation strategy are wrong. The half-finished basements we see most often share the same three problems: water intrusion the prior contractor "drylocked over," batt insulation packed against a cold foundation wall (a frost-line condensation trap), and bedrooms framed without a compliant egress window. We don't skip any of those.

What we handle

  • Moisture diagnosis and remediation: interior drainage mat, sealing of cracks, exterior repair when warranted
  • Insulation: closed-cell spray foam on foundation walls and rim joists, vapour-managed assemblies
  • Framing, drywall, painting, flooring (engineered hardwood, LVT, carpet)
  • Egress windows for legal basement bedrooms — opening sized to code, well and ladder installed, permit filed
  • Bathrooms: full rough-in, pump systems where the sewer is above slab, finished tile work
  • Wet bars and kitchenettes, including in-law suite layouts
  • Home theatres: acoustic treatment, dedicated circuits, in-wall speaker pre-wire
  • Electrical panel upgrades when capacity is short
  • HVAC distribution and dehumidification strategy

What it costs

Most finished basements in Montreal and the West Island land between $35,000 and $110,000. A 600–800 sq ft family room with mid-grade finishes, recessed lighting, and a powder room runs about $35K–$55K. A 1,000+ sq ft basement with a full bathroom, wet bar, egress upgrades, built-ins, and home-theatre prep runs $80K–$110K. In-law suites with separate cooking and laundry typically reach the top of the range or above.

How the schedule works

From signing, expect 10–20 weeks: 2–6 weeks of design, engineering, and permit filing; 8–14 weeks on site. We do interior framing first, then rough-in plumbing and electrical, then inspections, then insulation, drywall, and finishes. We do not start finishes until the basement has run through a wet weekend with no water intrusion.

Recent basement projects

A note on insurance and warranty

Every finished basement we deliver carries the standard Revohouse one-year workmanship warranty plus the manufacturer warranties on installed assemblies. We document the as-built mechanical, drainage, and waterproofing layout so future homeowners know what is behind the drywall. For in-law suites and rental units we also coordinate with your insurer to confirm that the renovated configuration is on cover before turnover. None of this costs extra — it is part of how we close a basement project.

What we handle

  • · Design & 3D visualization
  • · Permits & condo-board coordination
  • · Demolition, structural, electrical, plumbing, finishes
  • · Project management with weekly updates
  • · Final walkthrough & warranty paperwork

What it costs

Most basement finishing projects in Montreal run between $35,000$110,000 depending on scope and finish level.

Open the estimator →
Frequently asked

Answers to the questions we hear most.

Six common questions. The longer list lives on the dedicated FAQ page after launch.

A finished basement typically runs 8–14 weeks on site. Design and engineering add 2–6 weeks beforehand, depending on whether structural egress work or a bathroom rough-in is involved.